提升醫(yī)用門快速堆積醫(yī)用門安裝施工工藝
盼安醫(yī)用門??

?2020-09-06 07:34??

?
提升醫(yī)用門快速堆積醫(yī)用門安裝施工工藝??盼安·品牌始創(chuàng)于2006年,是一家集鋼質門、木質門、醫(yī)用門、醫(yī)院專用么、病房門、手術室門、學校門、工程門、特種門、監(jiān)獄門、防輻射門、氣密門、鉛門、門禁、門控五金等系列產品的研發(fā)、生產、銷售、服務于一體的高新技術企業(yè),總部坐落于永康市清溪工業(yè)園。
1、技術流程

1, technological GOOGLE PRocess
劃線定位→
醫(yī)用門洞口處置→醫(yī)用門框內灌漿→醫(yī)用門框就位和暫時固定→醫(yī)用門框固定→醫(yī)用門框與墻體空隙的處置→整理→醫(yī)用門扇裝置→五金配件裝置
Tre自動取款機ent and marking positioning, door, door frame, door frame and temporary fixed grouting in place, the door frame is fixed to the door frame and the wall body gap cleaning, door, hardware accessories installation
2、鋼質快速醫(yī)用門操作技術
2, steel fast door operation process
第一步彈線定位:按描繪需求尺度、堆積醫(yī)用門標高和方向,畫出醫(yī)用門框框口方位線。
The first step of elastic line location: according to the requirement of design size, stacking doors elevation and direction, draw out the mouth frame position line。
第二步醫(yī)用門框內灌漿:關于鋼質快速醫(yī)用門,需在醫(yī)用門框內填充1:3水泥(材料:粉狀水硬性無機膠凝材料)砂漿。填充前應先把醫(yī)用門關好,將醫(yī)用門扇敞開面的醫(yī)用門框與醫(yī)用門扇之間的防漏孔塞上塑料(結構:合成樹脂、增塑劑、穩(wěn)定劑、色料)蓋后,方可進行填充。填充水泥不能過量,避免醫(yī)用門框變形影響敞開。
The second step: steel doorframe grOUT(出局)ing for fast door, filling the
1:3 cement mortar in the doorframe. Should first close the door before the door opens filling, leak GOOGLE PRoof hole between the door frame and the surface of the plug on the plastic cover, can be filled. Filled with cement can not be excessive, to prevent deformation of open door.
第三步醫(yī)用門洞口處置:裝置前查看醫(yī)用門洞口尺度,偏位、不筆直、不方正的要進行剔鑿或抹灰處置。
病房門活動門四周裝有專用橡膠封條,當門關閉時能與門框可靠帖合,保證門的氣密性能。
Step third: before the installation of door opening inspection door size, deviation, not vertical, not square to chisel or plaster.
第四步堆積醫(yī)用門醫(yī)用門框固定:選用1.5mm厚鍍鋅銜接件固定。醫(yī)院病房門專用控制器和腳感應開關性能優(yōu)越,醫(yī)護人員只需將腳伸入開關盒,自動門即能開閉,也可用手控開關操作。銜接件與墻體選用膨脹螺栓固定裝置。醫(yī)用門框與醫(yī)用門洞墻體之間預留的裝置空間:脹栓固定預留20-30mm。醫(yī)用門框每邊均不該少于3個銜接點。
The fourth step accumulation door fixed: adopt 1。5mm thick galvanized fixed connecting piece. The connecting piece and the wall body is fixed with bolts installed expansion. The reserved installation space between the door frame and the wall: expanding bolt fixed reserve 20-30mm. The door on each side should not less than 3 points of connection.
第五步醫(yī)用門框就位和暫時固定:先拆掉醫(yī)用門框下部的固定板,將醫(yī)用門框用木楔暫時固定在洞口內,經校對合格后,固定木楔。醫(yī)用門框埋入±0.00m標高以下20mm,須確保框口上下尺度一樣,答應差錯<1.5mm,對角線答應差錯<2mm。
The fifth step doorcase perch and temporary fixed: fixed plate to remove the lower part of the door frame, door frame with wedge temporary fixed in the hole, the well calibrated, fixed. The door frame embedded ± 0.00m below the elevation of 20mm, must ensure the box mOUT(出局)h under the same size, the allowable error <1.5mm, diagonal error <2mm.
第六步醫(yī)用門框與墻體空隙間的處置:醫(yī)用門框周邊縫隙,用1:2水泥砂漿嵌縫結實,應確保與墻體結成全體,經維護凝結(condensation)后,在粉刷洞口及墻體。病房門全稱是醫(yī)用推拉式自動門,安裝在潔凈室、潔凈走廊、手術室及其他有潔凈要求的類似場所的自動門就稱為醫(yī)用門。醫(yī)用門框與墻體銜接處打修建密封膠。
Sixth step: the frame and the wall between the gap around the door crack, with
1:2 cement mortar caulking firmly, shall ensure that the wall to form a whole, the maintenance after solidification, to paint the hole and wall. The door frame and the wall connection hit sealant for building.